A rooftop solar site survey checklist that prevents rework.

Most quotation errors begin at the survey. A survey that records the same facts every time, with photos, gives the quotation team something solid to price and the installation team something solid to follow.

The short answer Record the roof, the shade, the electrical connection and the access, attach categorised photos, and end with a clear verdict. Make the surveyor, date and location part of the record.

Before you leave for the site

Confirm the address, contact person and the best time to visit. Open the enquiry so that what you record attaches to it.

Carry the same checklist every time. Consistency lets the quotation team compare surveys without guessing what was skipped.

The roof

  • Roof type and condition, such as concrete, sheet or tile
  • Usable area, with obstructions marked
  • Orientation and tilt
  • Parapet, water tank, staircase head room and other structures
  • Load-bearing comfort for the mounting structure

Shade and sun

  • Nearby buildings, trees and poles that can shade the array
  • Times of day when shade falls on the usable area
  • Photos taken from the proposed array position

The electrical side

  • Sanction load, connection type and phase
  • Meter location and condition
  • Distribution board position and spare capacity
  • Earthing condition and cable routes between roof and board

Access and logistics

  • How material gets to the roof, such as stairs, lift or crane
  • Safe working conditions on the roof
  • Parking and storage for material at the site

Photos that help later

Photos are the survey's evidence. Group them by what they show so someone can find the meter photo or the shade photo without scrolling through a gallery.

  • Roof overview and each section
  • Shade sources
  • Meter and distribution board
  • Earthing points
  • Access route

Capture the location of the visit with the survey, so there is proof that the surveyor reached the right site.

End with a verdict

A survey is only useful if it ends in a decision. Record one of three outcomes, so the next team knows what to do.

  • Go, the site is suitable as surveyed
  • Conditional go, the site works if named conditions are met
  • No go, with the reason

Keep this

  • Use the same checklist on every survey.
  • Group photos by what they show.
  • Finish with go, conditional go or no go.

Published 11 October 2026 by HelioLattice.

Questions

Common questions.

How long should a survey take?
It depends on the site. The checklist matters more than the time, because it makes each survey complete.
Can the survey be done on a phone?
Yes. A mobile browser can capture the details, photos and location during the visit.
Who should do the survey?
A trained surveyor or engineer, with the quotation team available to ask follow-up questions while still on site.