Problems we solve · Delivery
Get solar jobs moving again when they stall on DISCOM and subsidy paperwork.
The system is ready to install, but the sanctioned load letter is missing, the utility application is pending, or a subsidy document was rejected. Nobody can say who is chasing what. Paperwork delays cost weeks, tie up cash and test the patience of customers.
Why does paperwork hold up solar jobs? Approvals and documents depend on many people, including the customer, the utility and your own staff. When the steps are not on a shared checklist with an owner for each, jobs wait silently until someone remembers.
Signs you have it
How paperwork delays show up.
Silent waiting
Jobs sit for weeks and nobody knows why.
Missing documents
The same papers requested from the customer repeatedly.
No owner
Everyone assumes someone else is following up.
Rework
A rejected document found late in the process.
How HelioLattice fixes it
A checklist where every step has a name next to it.
Put the steps on a checklist
Utility application, sanction, net metering and subsidy steps become stages with the documents each one needs.
Show only what applies
Switch subsidy, bank loan and utility approval on or off, and the stages that depend on them appear or disappear.
Name an owner
Each stage is assigned to a person, and that person's work queue shows what is due.
Verify documents
Uploaded documents are marked pending, verified or rejected, so a wrong paper is caught the day it arrives.
What changes
Visibility is most of the cure.
Progress and idle days
Each job shows how far along it is and how long it has been idle, so stalled jobs rise to the top.
- Idle days on jobs
- Open jobs in the work queue
Owner on every stage
A stage assigned to someone is worked by that person, with an override for managers.
- Locks by stage
- Override for managers
Document checks
Documents are verified against what the stage needs, with the status visible to everyone.
- Pending, verified, rejected
- Stored with the job
Reminders and tasks
Create tasks and reminders tied to a job, and mark a task blocked when it is waiting on someone else.
- Task templates
- Overdue counts
Questions
Common questions.
Can we include utility and subsidy steps in our checklist?
How do we see which jobs are stuck?
Can the system flag a wrong document?
Do these steps differ by state?
Map your approval steps into a checklist.
Bring the steps your jobs go through and we will turn them into stages with owners.